Brewster Wind Farm Status: In Development Nameplate Capacity (MW): 197.2 MW Capstone and Wei Wai Kum First Nation (Wei Wai Kum) successfully submitted a proposal to BC Hydro, in their recent Call for Power for the nearly 200 MW Brewster wind farm near Camp...
Highland Valley Wind Farm Status: In Development Nameplate Capacity (MW): 197.2 Capstone and the Ashcroft Indian Band partnered to submit a proposal for the nearly 197 MW Highland Valley wind farm to BC Hydro’s recent Call for Power. This wind pro...
Mount Mabel Wind Farm Status: In Development Nameplate Capacity (MW): 142.8 Capstone and Lower Nicola Indian Band (LNIB) partnered to submit a proposal for the nearly 143 MW into the BC Hydro’s recent Call for Power. The project will be locat...
Wild Rose 2 Wind Status: In Development Nameplate Capacity (MW): 192 The Wild Rose 2 Wind Farm is a 192 MW renewable energy facility currently in construction by Capstone. The project is located in Cypress County, Alberta, approximately 30 km southe...