Capstone Projects

In Development

  • In Development Wind

  • In Development Solar

Search for Projects

Categories


Sort By


Brewster Wind Farm

Status: In Development

Nameplate Capacity (MW): 197.2 MW

Capstone and Wei Wai Kum First Nation (Wei Wai Kum) successfully submitted a proposal to BC Hydro, in their recent Call for Power for the nearly 200 MW Brewster wind farm near Camp...

Highland Valley Wind Farm

Status: In Development

Nameplate Capacity (MW): 197.2

Capstone and the Ashcroft Indian Band partnered to submit a proposal for the nearly 197 MW Highland Valley wind farm to BC Hydro’s recent Call for Power.    This wind pro...

Mount Mabel Wind Farm

Status: In Development

Nameplate Capacity (MW): 142.8

Capstone and Lower Nicola Indian Band (LNIB) partnered to submit a proposal for the nearly 143 MW into the BC Hydro’s recent Call for Power.     The project will be locat...

Wild Rose 2 Wind

Status: In Development

Nameplate Capacity (MW): 192

The Wild Rose 2 Wind Farm is a 192 MW renewable energy facility currently in construction by Capstone. The project is located in Cypress County, Alberta, approximately 30 km southe...

News Centre

Contact

P: 416 649 1300
E: info@capstoneinfra.com
155 Wellington Street West, Suite 2930
Toronto, Ontario Canada
M5V 3H1

Copyright © All right reserved