Capstone Projects

In Development

Wild Rose 2 Wind

Capstone Ownership

100%

Nameplate Capacity (MW)

192

Wild Rose 2 Wind

Overview

The Wild Rose 2 Wind Farm is a 192 MW renewable energy facility currently in development by Capstone. The project is located in Cypress County, Alberta, approximately 60 km southeast of Medicine Hat. Capstone acquired the project from NaturEner Canada Inc. in November 2021 and expects to break ground for construction in 2022. 

The project assets are held by Wild Rose 2 Wind LP, a subsidiary of Capstone. This includes the Power Plant Approval for the wind farm and the Permit & License for the project substation. 

Following Capstone's acquisition of the the Project, a lot of work has been done to ensure the wind farm's long-term success. Capstone has secured two offtake agreements to sell the power and renewable attributes generated by the Project to Pembina Pipeline Corporation (105 MW over 15 years) and City of Edmonton (78 MW over 20 years). In addition, Capstone has updated the project layout and selected a turbine manufacturer that will allow for a significant reduction the overall project footprint and minimize potential impacts. 

Details relating to the new technology and project layout are outlined in Newsletter #2, which you will find below in the Related Documents as well as a site map and technical reports.

Other Projects

Buffalo Atlee Wind Farm

The Buffalo Atlee wind power projects are located approximately 10 km southeast of the hamlet of ...

News Centre

Contact

P: 416 649 1300
E: info@capstoneinfra.com
155 Wellington Street West, Suite 2930
Toronto, Ontario Canada
M5V 3H1

Copyright © All right reserved