Wild Rose 2 Wind

Capstone Ownership

100%

Nameplate Capacity (MW)

192

Wild Rose 2 Wind

Overview

The Wild Rose 2 Wind Farm is a 192 MW renewable energy facility currently in construction by Capstone. The project is located in Cypress County, Alberta, approximately 30 km southeast of Medicine Hat. Capstone acquired the project from NaturEner Canada Inc. in November 2021.

Regulatory approval was obtained in July 2024 for 36 out of the 38 proposed turbines and is being held by Wild Rose 2 Wind Inc., a subsidiary of Capstone. The remaining two turbines are currently in developmentCapstone has secured two offtake agreements to sell the power and environmental attributes generated by the Project to Pembina Pipeline and City of Edmonton.

Newsletters, project updates, site maps, and technical reports can be found in the Related Documents. 

News Centre

Contact

P: 416 649 1300
E: info@capstoneinfra.com
155 Wellington Street West, Suite 2930
Toronto, Ontario Canada
M5V 3H1

Copyright © All right reserved