Capstone Projects

Operating Facilities

Watford Wind Farm

Year Built

2012

Capstone Ownership

100%

Nameplate Capacity (MW)

10

Watford Wind Farm

Overview

The Watford Wind Facility project is a 10 megawatt (MW) wind energy project located near the municipality of Brooke-Alvinston in Ontario. The project was awarded a 20-year term power purchase agreement by the IESO that expires in 2032. The project consists of 4 Samsung 25xc wind turbines.

The Brooke-Alvinston Wind Farm is approved under Part V.0.1 of the Environmental Protection Act (O. Reg. 359/09).

Renewable Energy Approval No. 6250-8KFTCQ Download  571 KB

Reports prepared in support of an application for a Renewable Energy Approval (“REA”) were completed to satisfy the requirements of O. Reg. 359/09 and can be viewed and downloaded below.  

Other Projects

Erie Shores Wind Farm

Erie Shores Wind Farm consists of 661 General Electric SLE1.5 wind turbines/gener...

Ganaraska

The ZEP Wind Farm Ganaraska is a 17.60 megawatt (MW) wind ene...