Watford Wind

Overview

The Watford Wind Facility project is a 10 megawatt (MW) wind energy project located near the municipality of Brooke-Alvinston in Ontario. The project was awarded a 20-year term power purchase agreement by the IESO that expires in 2032. The project consists of 4 Samsung 25xc wind turbines.

The Brooke-Alvinston Wind Farm is approved under Part V.0.1 of the Environmental Protection Act (O. Reg. 359/09).

Renewable Energy Approval No. 6250-8KFTCQ Download  571 KB

Reports prepared in support of an application for a Renewable Energy Approval (“REA”) were completed to satisfy the requirements of O. Reg. 359/09 and can be viewed and downloaded below.  

Other Projects

Ravenswood Wind

The 9.9 MW Ravenswood Wind Facility located near Forest, Ontario commenced commercial operation in J...

Erie Shores Wind Farm

Erie Shores Wind Farm consists of 661 General Electric SLE1.5 wind turbines/gener...

Springwood Wind

The Springwood Wind Farm is a 8.2 megawatt (MW) wind energy facility located in the Township of C...

News Centre

Contact

P: 416 649 1300
E: info@capstoneinfra.com
155 Wellington Street West, Suite 2930
Toronto, Ontario Canada
M5V 3H1

Copyright © All right reserved