Goulais Wind Farm

Year Built

2015

Capstone Ownership

51%

Nameplate Capacity (MW)

25

Goulais Wind Farm

Overview

The 25-megawatt Goulais Wind Farm is on private land within the Townships of Pennefather and Aweres in the district of Algoma. The wind farm site includes 11 Siemens S113-2.3MW turbines and is located on the plateau between Highway 17 and the Prince II Wind Farm at distances of approximately 5 kilometres northwest of Heyden and 5 km south of Goulais River. The project has a 20-year Feed-in-Tariff (FIT) contract with the Independent Electricity System Operator (IESO) expiring in 2035.

Renewable Energy Approval No. 3507-9ABJWH Download - 3, 969 KB

Amendment to the Renewable Energy Approval No. 3507-9ABJWH Download - 195 KB

Reports prepared in support of an application for a REA were completed to satisfy the requirements of O. Reg. 359/09 and can be viewed and downloaded below.

Other Projects

Erie Shores Wind Farm

Erie Shores Wind Farm consists of 661 General Electric SLE1.5 wind turbines/gener...

Ganaraska

The ZEP Wind Farm Ganaraska is a 17.60 megawatt (MW) wind ene...

News Centre

Contact

P: 416 649 1300
E: info@capstoneinfra.com
155 Wellington Street West, Suite 2930
Toronto, Ontario Canada
M5V 3H1

Copyright © All right reserved