Capstone Projects

Operating Facilities

Goulais Wind

Year Built

2015

Capstone Ownership

51%

Nameplate Capacity (MW)

25

Goulais Wind

Overview

The 25-megawatt Goulais Wind Farm is on private land within the Townships of Pennefather and Aweres in the district of Algoma. The wind farm site includes 11 Siemens S113-2.3MW turbines and is located on the plateau between Highway 17 and the Prince II Wind Farm at distances of approximately 5 kilometres northwest of Heyden and 5 km south of Goulais River. The project has a 20-year Feed-in-Tariff (FIT) contract with the Independent Electricity System Operator (IESO) expiring in 2035.

Renewable Energy Approval No. 3507-9ABJWH Download - 3, 969 KB

Amendment to the Renewable Energy Approval No. 3507-9ABJWH Download - 195 KB

Reports prepared in support of an application for a REA were completed to satisfy the requirements of O. Reg. 359/09 and can be viewed and downloaded below.

Other Projects

Ravenswood Wind

The 9.9 MW Ravenswood Wind Facility located near Forest, Ontario commenced commercial operation in J...

Erie Shores Wind Farm

Erie Shores Wind Farm consists of 661 General Electric SLE1.5 wind turbines/gener...

Springwood Wind

The Springwood Wind Farm is a 8.2 megawatt (MW) wind energy facility located in the Township of C...

News Centre

Contact

P: 416 649 1300
E: info@capstoneinfra.com
155 Wellington Street West, Suite 2930
Toronto, Ontario Canada
M5V 3H1

Copyright © All right reserved