Capstone Projects

Operating Facilities

Ganaraska Wind

Year Built

2016

Capstone Ownership

50%

Nameplate Capacity (MW)

17.6

Ganaraska Wind

Overview

The ZEP Wind Farm Ganaraska is a 17.60 megawatt (MW) wind energy project located in the town of Orono, Ontario. In April 2010, the project was awarded a 20-year term power purchase agreement by the IESO under the Feed-in Tariff (FIT) program. The project consists of 9 Senvion (formerly named REpower) MM92 wind turbines, with a rated capacity of 2.05 MW or 1.88 MW.

Project Location Map  Download 

Renewable Energy Approval No. 1426-9RWTSS Download

Reports prepared in support of an application for a Renewable Energy Approval (“REA”) were completed to satisfy the requirements of O. Reg. 359/09 and can be viewed and downloaded below. 

Community initiatives in the vicinity of our Ganaraska Wind Farm may be eligible for support through our Community Enhancement Fund. Guidelines, eligibility requirements, and application forms for this program are available for download here and in the Related Documents section. 



Other Projects

Ravenswood Wind

The 9.9 MW Ravenswood Wind Facility located near Forest, Ontario commenced commercial operation in J...

Erie Shores Wind Farm

Erie Shores Wind Farm consists of 661 General Electric SLE1.5 wind turbines/gener...

Springwood Wind

The Springwood Wind Farm is a 8.2 megawatt (MW) wind energy facility located in the Township of C...

News Centre

Contact

P: 416 649 1300
E: info@capstoneinfra.com
155 Wellington Street West, Suite 2930
Toronto, Ontario Canada
M5V 3H1

Copyright © All right reserved